Treat the loop as part of the system
Record the intended water quality at each outlet, the building layout and the operating schedule. Include the tank, piping, monitoring and maintenance access in the design discussion.
Plan access and operation
Clarify available space, drain locations, required access and who will operate the system. Ask for drawings and model-specific documentation.
Verify the proposed materials
Request documented material selection, compatibility and cleaning procedures for the intended use. Final choices require engineering review.
This page offers planning guidance. Product suitability and performance require verified model documentation and application review.